RESOLUTION NUMBER 40140 OF 2025
- Current Normativity
- RESOLUTION NUMBER 40140 OF 2025
Our Social media
“By which transitory guidelines are issued to promote the permanence of electric power generation projects for the energy transition, which have an assigned connection point that are in a condition of overlapping with other projects of the Mining-Energy Sector and/or that depend on SIN expansion projects.”
Copyright: https://www.freepik.es
M&M Estudio Jurídico. All Rights Reserved.
© 2025 M&M ESTUDIO JURÍDICO.
All Rights Reserved.